观看在线免费黄色片|黄色激情网站深爱午夜|美女视频网站久久久|五月天久久伊人欧美|热久久久久久久久久久|绯色不卡一区二区性爱|完整一级av特一级免费视频|日本色网站在线观看|超碰久久久精品无码在线|亚洲性爱九九国产成人911

Contact Us

AC Fan after the installation is complete the note

Date: 2016-5-11   Click: 1807 Times

"AC Fan" after installation, flip a hand wheel, check whether tight or grazing to other sites. In the absence of exceptional circumstances, you can test run, the exposed part of the fan drive apparatus should be shielded, which in the "AC Fan" is not the whole package, user supplied, if the air inlet pipe is not connected, then, also need to add a protective cover. The fan is equipped with electronic control box must match the fan phase. In particular, note that, when the fan wiring, be sure to get a professional electrician wiring, the wiring must be correct and reliable, especially at the electrical control box terminal number must be consistent with the fan numbers on the fan after installation to check the entire installation the "AC Fan" living within the impeller is not a tool to pull down or other debris.

Back to: Industry news

+86-0769-83660708

Home Product News Contact